SiteworkMath — cubic-yard markConstruction math from people who’ve thrown the wheelbarrow.
Tools indexThree groups · pick by what you’re trying to answer

Sitework calculators — pricing the whole project, one trade, or a material order.

Three groups, three questions. Plan the project — can the whole rehab or new-build survive its budget and schedule before I call contractors? Refine a trade — what will electrical or plumbing actually force on this house once an inspector walks it? Take off materials — what should I actually order, and how much cushion absorbs the surprise on delivery day?

Plan the whole project — before you call contractors

Feasibility budget + schedule horizon. The two halves of every walk / bid / kill decision.

Refine a trade — deeper than the flagship line

Each trade calculator turns one budget line into a scope-aware estimate, with the inspection flags that generic cost guides usually skip.

Take off the materials — once a phase is in scope

Core take-off tools. Each calc outputs a four-line Material Order Cushion: the exact math, the practical-order amount, the cushion reasoning, and the “when not to over-order” ceiling.